Space Engineers Group Survival Wikia

Constructed by The Company on Charon, the Digging Rig appears to be a large, possibly automated drilling system similar in design to Earth-based tunnel boring machines. When shown on camera, the structure was not in operation.

2017-04-23 09 52 21-CHARON - Space Engineers 'Group Survival' Story (S2E8+9) - YouTube

Drilling rig, as seen from above.

In the rock around the rig there are various rooms. The rig itself has a

2017-04-23 09 52 38-CHARON - Space Engineers 'Group Survival' Story (S2E8+9) - YouTube

Drill deck. Presumably there would be some sort of spin put on the structure to allow the drill heads to circulate over the bottom of the pit.

In the rock around the rig there are various rooms. On the top of the rig there are Some landing platforms. These platforms have a road that leads outside of the digging complex. The only person in the area is the Vapengineer.

2017-04-23 09 53 02-CHARON - Space Engineers 'Group Survival' Story (S2E8+9) - YouTube

Mid-level deck, presumably used for monitoring drilling equipment below.

2017-04-23 09 53 37-CHARON - Space Engineers 'Group Survival' Story (S2E8+9) - YouTube

Underside of the upper platform, presumably showing mineral extraction and refinery operations.

2017-04-23 09 54 04-CHARON - Space Engineers 'Group Survival' Story (S2E8+9) - YouTube

Upper deck, with hydrocarbon venting ports to deal with safely burning uncaptured gasses from the drilling process.

2017-04-23 09 54 40-CHARON - Space Engineers 'Group Survival' Story (S2E8+9) - YouTube

The rig did not appear to be in operation in the video, or had finished its work and was no longer being used, given that the catwalks and the rig itself appear to have been anchored to the crater rim.